Data sources
Every input to the pricing engine, where it comes from, and how often it is refreshed.
Last updated
Public datasets
Labor wages: BLS OEWS
Hourly wages by occupation for the nation, every state and roughly 530 metropolitan and nonmetropolitan areas come from the Bureau of Labor Statistics Occupational Employment and Wage Statistics program. It is published annually (May reference period, released the following spring) and is in the public domain. We use the median and the 25th and 75th percentiles for these occupations:
- 47-2051 Cement masons and concrete finishers
- 47-2061 Construction laborers
- 47-2111 Electricians
- 47-2141 Painters, construction and maintenance
- 47-2152 Plumbers, pipefitters and steamfitters
- 49-9021 Heating, air conditioning and refrigeration mechanics and installers
- 37-3011 Landscaping and groundskeeping workers
- 49-9071 Maintenance and repair workers, general (the handyman rate pages and builder use it, labeled as a proxy)
- 47-2031 Carpenters
Geography: Census Bureau and HUD
ZIP codes are mapped to counties and metropolitan areas with the HUD USPS ZIP crosswalk and Census Bureau delineation files. City populations come from the American Community Survey. All are public.
Sales tax
We store each state's base sales-tax rate on materials, taken from the state revenue department. Local add-on rates vary within a state and are not applied; the page labels the figure "state base rate".
Frost depth and climate
Recommended footing depth and the air-entrained-mix note come from International Residential Code and International Energy Conservation Code climate-zone references and state building-code summaries.
Ready-mix concrete price: NRMCA and BLS PPI
The ready-mix price per cubic yard starts from the National Ready Mixed Concrete Association's published 2023 figure of $159.68, the average revenue per cubic yard reported in its Annual Performance Benchmarking Survey and State of the Industry (October 2024). We carry it forward with the Bureau of Labor Statistics producer price index for ready-mix concrete, series WPU1333: the 2023 figure times the latest monthly index, divided by the 2023 average of the index. The index is refreshed monthly, and the build fails if it is more than 90 days old. It is a national figure; local plants charge more or less.
Estimates and what we collect
Other material prices
Bagged mix, rebar, wire mesh, gravel, forms and finishing supplies are our estimates: national figures, labeled "estimated" on every page. Each row records what the estimate is based on and the date it was set. An estimate is replaced when a local price is sampled (the row then carries the source link, the ZIP code and the date) or when a tradesperson corrects it. Send corrections to hello@americanbuildrate.com; with your permission, we credit you.
Quote checks
Anonymous quote checks (project type, size, ZIP, quoted amount, verdict) are stored without personal data. They count toward a location's data completeness; they don't set prices.
What we do not use
We do not use, scrape or republish licensed cost databases such as RSMeans. We do not use competitor calculators as a data source.
Release log
Generated from the data snapshot built on . Labor release: BLS OEWS May 2025. ZIP crosswalk coverage: curated+prefix.
| Dataset | Release | Retrieved | Rows | Source and license |
|---|---|---|---|---|
| Labor wages by occupation (national, state, metro) | BLS OEWS May 2025 | 3,899 | U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics — https://www.bls.gov/oes/ · Public domain | |
| State sales-tax base rates | as of Jan 1, 2025 | 51 | State department of revenue rates as compiled in Tax Foundation, "State and Local Sales Tax Rates, 2025" · PublicBase rate only; local add-ons excluded; pending per-state verification. | |
| Climate zone, frost depth, pour season (state level) | IECC 2021 zones | 51 | IECC 2021 climate zone map (dominant zone per state); frost depth typical values from state/local building-code summaries — state-level approximation, verify per city · Public referencesState-level approximation; cities override in Phase 5. | |
| Concrete material and labor-hour items | as of Sep 25, 2026 | 56 | Our estimates (national), except ready-mix, which is sourced (see its own entry); replaced as prices are sampled or corrected by tradespeople · Own estimatesNational only. | |
| Ready-mix concrete price | NRMCA 2023 indexed to August 2026 (BLS PPI WPU1333) | 1 | NRMCA Annual Performance Benchmarking Survey and State of the Industry (October 2024) — https://www.nrmca.org/wp-content/uploads/Performance_Benchmarking_Survey_and_State_of_the_Industry.pdf; BLS PPI WPU1333 — https://data.bls.gov/timeseries/WPU1333 · PublicUSD 173.97 per cubic yard = 159.68 × 395.186 / 362.716 | |
| ZIP → CBSA crosswalk | curated stop-gap | 40 | Hand-verified central-city ZIP → CBSA (OMB 2023 delineations); stop-gap until the HUD USPS crosswalk is loaded; USPS 3-digit ZIP Code prefix allocation (public); state only, no county or metro · Public / ownSet HUD_API_TOKEN and re-run the ETL to load the full USPS crosswalk. | |
| City populations (curated principal cities) | Census 2020 decennial (curated) | 64 | U.S. Census Bureau 2020 decennial counts, curated seed (verified:false until CENSUS_API_KEY loader runs) · Public domainverified:false — replaced by the ACS loader when CENSUS_API_KEY is set |