Free Construction Estimate Template

A construction estimate has to survive the lender, the client and the change order. This template separates materials from labor on every line, carries markup and tax as their own rows, and leaves room for exclusions and a schedule so the number you sign is the number you build to.

Download the template

Skip the spreadsheet: fill in this construction estimate on your phone →

Sample prices are national estimates at a $42/hr labor rate and 15% markup (sample total $61,104); replace them with your own.

Fill it in online

The same template as a working estimate: edit lines, add from the construction library, download a draft PDF, or save it to reuse (free account: unlimited drafts, five tracked sends a month).

DescriptionQtyUnitMaterial/unitLabor hrs/unitRateLine
$1,711.20
$4,923.84
$11,310.48
$4,620.70
$10,416.70
$4,876.00
$10,350.00
$10,531.70
$2,363.25

What the construction estimate template contains

  1. Contractor and client block with license number
  2. Scope summary and site address
  3. Line items: description, quantity, unit, material, labor hours, rate, line total
  4. Subtotal, markup, tax, total
  5. Exclusions and allowances
  6. Payment schedule tied to milestones
  7. Validity period and signature lines

Sample lines in this template

LineQtyMaterial/unitHours/unitLine total
Site clearing and rough grading2400 sq ft$00.01$1,711
Foundation stem wall, 8 in CMU320 sq ft$80.14$4,924
Floor framing and subfloor1200 sq ft$60.063$11,310
Exterior wall framing, 2x6140 linear ft$140.35$4,621
Roof trusses and sheathing1400 sq ft$50.035$10,417
Windows, double-hung vinyl10 ea$3402$4,876
Siding, fiber cement1500 sq ft$40.05$10,350
Drywall, hung and finished3800 sq ft$10.03$10,532
Dumpster and temporary facilities3 month$6850$2,363

Tips for this kind of estimate

  • Put allowances (fixtures, flooring, lighting) on their own lines with the dollar amount in the description.
  • List exclusions: permits, engineering, utility fees, landscaping. Silence is read as included.
  • Tie payments to milestones (foundation, dry-in, drywall, final) rather than dates.

Questions

Is a construction estimate a contract?

Not by itself. Once the client signs the acceptance block it becomes an offer they have accepted; attach your terms or a separate contract for anything larger than a small job.

How long should the estimate stay valid?

Thirty days is typical; lumber and steel move, so shorter is reasonable in a volatile market. The template prints a validity date.